Tamarama Sectional Sofa

Tamarama Sectional Sofa Tamarama Sectional Sofa
Tamarama Sectional Sofa Tamarama Sectional Sofa
New
Regular price $4,600
Regular price Sale price $4,600
Save $-4,600
Shape: Curved
Configuration: Sofa
Color: Aussie Latte Tagged Luxe
Classic Fabric
Premium Fabric

Size: 4 Sections

W137" x D71" x H37"


Section Width: Regular

View full product details
  • Truck Icon Free, fast delivery
  • Calendar icon 120-day returns
  • Shield icon 5-year warranty

Product Description

The Tamarama is an elevated icon, designed for timeless, all-day comfort. With modular flexibility, ultra-soft HyperCloud™ Foam, and washable covers, it’s style that stays with you.

Dimensions

Footprint width: 137"

Footprint depth: 71"

Height: 37"

Seat height: 20.5"

Seat depth (with back cushion): 25"

Seat depth (without back cushion): 33"

Weight: 342.8lb

Materials, sustainability & care

Forest Walk, Bronzed Aussie, Winter Cream fabrics: Face: 100% Recycled Polyester, Backing: 100% Polyester

Aussie Latte, Frosty Grass, Pebble Beach fabrics: Face: 70% Polyester, 20% Recycled Polyester, 10% Acrylic, Backing: 100% Polyester

Frame: FSC® Certified Wood

Foam: Polyurethane Foam

Fill (Armrest Cushions/ Backrest Cushions / Seat inserts): Polyester Fibre & Polyurethane Foam

Legs: Polypropylene

Sustainability

All timber materials in this product come from FSC® -certified forests.

By choosing this FSC®-certified and labelled product, you show your commitment to forests and those that depend on them.

FSC® N003088
www.fsc.org

Country of Origin: Designed by Koala in Sydney, assembled in China.

Care

Fixed Frame, Arm & Lining Cushion Covers:

  • Do not remove lining covers for separate cleaning even though they have zippers.
  • Spot clean only with warm water & mild detergent mix.
  • Do not scrub with a stiff brush.
  • Use a clean cloth to blot out excess liquid.
  • Do not wet filling.
  • Allow to thoroughly dry before re-use.
  • Do not bleach.
  • Do not iron.
  • Do not dry clean.
  • Ensure removable covers are completely dry before fitting covers back on.

Removable Cover Care

  • Vacuum on low suction to remove dust and grit.
  • Give your cushions some love by regularly rotating them, changing their positions and plumping them up. This keeps them looking full and prevents "favourite spot" wear and tear.
  • Smooth & straighten covers: Take a moment to align hems, smooth out wrinkles, and adjust covers to keep the silhouette sharp.
  • Position your sofa away from direct sunlight to prevent fabric fading over time.

For spills & accidents:
- Act Fast: Blot spills immediately with a clean, dry cloth or paper towel.
- No Scrubbing: Avoid using stiff brushes or harsh chemicals, as these can damage the fabric fibres.

WARNING:

  • Keep furniture a safe distance away from open flames and strong sources of heat (e.g., heaters, fireplaces, radiators, wall or floor vents). If left too close this may create a fire hazard or damage furniture, including internal frames and other components.
  • Do not modify or change any components within this product without specific advice from Koala. This will void your warranty and may cause instability, damage or collapsing of the frame, resulting in injury.
  • Careless use of cigarettes and matches could set fire to this product.

CAUTION:

  • Do not stand or jump on seat cushions, backrests, or arms. This may cause instability, damage or collapsing of the frame, resulting in injury. This unit is designed for seating or sleeping use only.
  • Do not drag this furniture. Always lift the furniture from the base when moving. Dragging can break the legs or damage the frame integrity. Use two or more people to move this item to avoid injury.

Pilling can occur occasionally as a result of normal daily wear and should not be considered a fault. Please check the care labels on your sofa bed to see if a battery-operated pilling tool is suitable for the removal of fiber pills.

Delivery

With our Free Standard Shipping, your order is delivered right to your room of choice. Our specialized freight carrier will call you early in its journey to schedule a delivery window that works for you.

Delivery Timeline: 7–21 days from your dispatch date.

Want a completely hands-off experience? Upgrade to our White Glove service at checkout!

Box 1
Dimensions: W39" x D12.6" x H28.7"
Boxed weight: 39.7lb

Box 2
Dimensions: W39" x D12.6" x H28.7"
Boxed weight: 39.7lb

Box 3
Dimensions: W31.1" x D15.7" x H28.7"
Boxed weight: 35.3lb

Box 4
Dimensions: W31.1" x D15.7" x H28.7"
Boxed weight: 35.3lb

Box 5
Dimensions: W31.1" x D15.7" x H28.7"
Boxed weight: 35.3lb

Box 6
Dimensions: W31.5" x D31.5" x H13.8"
Boxed weight: 50.7lb

Box 7
Dimensions: W31.5" x D31.5" x H13.8"
Boxed weight: 50.7lb

Box 8
Dimensions: W31.5" x D31.5" x H13.8"
Boxed weight: 50.7lb

Box 9
Dimensions: W48.8" x D20.1" x H28.7"
Boxed weight: 52.9lb

Box 10
Dimensions: W42.5" x D32.7" x H13.8"
Boxed weight: 55.1lb

120-Day Free Returns

We include a FREE 120-day trial when you buy any Koala product from our website (including sale items.)

Need to return your purchase? No worries, we’ll come pick it up FREE of charge and provide you with a full refund.

Product Features

Thoughtful Details

  • Woman lying on a beige sofa in a modern living room.
    Engineered support

    Sink into luxe comfort

  • Woman sitting on a green sofa in a bright room with large windows.
    Flexible modularity

    Moves when you do

  • Glass bottle with pink liquid on a textured surface next to a book titled 'The Curated Closet Workbook'.
    Premium washable fabrics

    Splash-resistant. Style forward.

  • Person holding a large white pillow on a couch
    Easy to change covers

    Change your look in seconds. Or years.

  • Woman in an orange top and brown pants lying on a white couch.
    Get comfy in your own time

    120 day trial

  • Person lying on a green sofa in a living room with books and a window in the background
    Designed with the world in mind

    Mindfully made comfort

Take a closer look.

Style that stays with you

Living room with a white sofa and large windows overlooking water.

All the pieces of style

These are the building blocks to your style. The Tamarama’s sofa, chaise, corner and armless modules all let you shape it in a way that suits your space from the very start. Arrange it your way, expand it over time, and create a layout that matches your style.

Your sofa starts here

Start your style with the Tamarama. It’s the foundation that anchors the room without locking you into one look. With relaxed curves, a coastal silhouette and quietly confident presence, the ‘Tama’ brings an adaptable aesthetic to your home.

Soft feels, stand out looks

Your style doesn’t need to be fixed in place. With our Koala-exclusive range of fabrics and colors, your Tamarama can evolve and change over time. From cozy, premium demi-bouclés, to smooth, velvety linen-look fabrics, we've got your style covered in six different colors.

Slip into something fresh

Style comes in so many different aesthetics. Sometimes they require a costume change. One year you’re minimal, the next you want your sofa to shine. Our water-resistant, washable and changeable covers make a fresh style as simple as possible.

Stand out with new shapes

With the Tamarama, you can stand out and make your own sofa statement. It’s as easy as flipping the chaise to the other side, or adding a new module (or two!). With true modularity your sofa style evolves in real time.

Ready for every move

From your first apartment to forever home and every rental inbetween. The Tamarama makes it easy to maintain and move your style with tool-free assembly and disassembly.

Take a closer look

Engineered comfort from every angle

Customer Reviews

FAQs about the Tamarama Sectional Sofa

How many configurations can I create with the Tamarama modular sofa?

Can I add more modules later to upscale my sofa from for example a 2-seater to a 4-seater?

How many throw cushions come with sofa?

Can I switch the chaise or corner from the left side to the right side?

How do I maintain the Tamarama modular sofa cushions?

Can I remove the covers for the Tamarama modular sofa?

Are the sofa covers supposed to be wrinkled?

Cozy home, and a healthy planet

  • koala sleeping in tree

    Help us save the 
koala from extinction

    Your order helps WWF protect koalas and work toward doubling their numbers by 2050. Over $5.5M donated so far.

  • sunny landscape

    Proud members
of 1% For The Planet

    At least 1% of the sales from every order helps environmental causes, and you've helped us donate over $21 million (AUD) to date.

  • greenery plant in forest with certified b corporation logo

    We’re a Certified 
B Corporation

    We meet the highest standards for social and environmental impact so you can feel good choosing us.

Sign up for up to $500 off your first order

Tamarama Sectional Sofa Aussie Latte (Luxe)

Aussie Latte (Luxe)
Regular price $4,600
Regular price Sale price $4,600