-
Product specifications
Product Description
The Tamarama is an elevated icon, designed for timeless, all-day comfort. With modular flexibility, ultra-soft HyperCloud™ Foam, and washable covers, it’s style that stays with you.
Dimensions
Footprint width: 148"
Footprint depth: 110"
Height: 37"
Seat height: 20.5"
Seat depth (with back cushion): 25"
Seat depth (without back cushion): 33"
Weight: 455.3lb
Materials, sustainability & care
Forest Walk, Bronzed Aussie, Winter Cream fabrics: Face: 100% Recycled Polyester, Backing: 100% Polyester
Aussie Latte, Frosty Grass, Pebble Beach fabrics: Face: 70% Polyester, 20% Recycled Polyester, 10% Acrylic, Backing: 100% Polyester
Frame: FSC® Certified Wood
Foam: Polyurethane Foam
Fill (Armrest Cushions/ Backrest Cushions / Seat inserts): Polyester Fibre & Polyurethane Foam
Legs: Polypropylene
SustainabilityAll timber materials in this product come from FSC® -certified forests.
By choosing this FSC®-certified and labelled product, you show your commitment to forests and those that depend on them.
FSC® N003088
www.fsc.orgCountry of Origin: Designed by Koala in Sydney, assembled in China.
Care
Fixed Frame, Arm & Lining Cushion Covers:
- Do not remove lining covers for separate cleaning even though they have zippers.
- Spot clean only with warm water & mild detergent mix.
- Do not scrub with a stiff brush.
- Use a clean cloth to blot out excess liquid.
- Do not wet filling.
- Allow to thoroughly dry before re-use.
- Do not bleach.
- Do not iron.
- Do not dry clean.
- Ensure removable covers are completely dry before fitting covers back on.
Removable Cover Care
- Vacuum on low suction to remove dust and grit.
- Give your cushions some love by regularly rotating them, changing their positions and plumping them up. This keeps them looking full and prevents "favourite spot" wear and tear.
- Smooth & straighten covers: Take a moment to align hems, smooth out wrinkles, and adjust covers to keep the silhouette sharp.
- Position your sofa away from direct sunlight to prevent fabric fading over time.
For spills & accidents:
- Act Fast: Blot spills immediately with a clean, dry cloth or paper towel.
- No Scrubbing: Avoid using stiff brushes or harsh chemicals, as these can damage the fabric fibres.WARNING:
- Keep furniture a safe distance away from open flames and strong sources of heat (e.g., heaters, fireplaces, radiators, wall or floor vents). If left too close this may create a fire hazard or damage furniture, including internal frames and other components.
- Do not modify or change any components within this product without specific advice from Koala. This will void your warranty and may cause instability, damage or collapsing of the frame, resulting in injury.
- Careless use of cigarettes and matches could set fire to this product.
CAUTION:
- Do not stand or jump on seat cushions, backrests, or arms. This may cause instability, damage or collapsing of the frame, resulting in injury. This unit is designed for seating or sleeping use only.
- Do not drag this furniture. Always lift the furniture from the base when moving. Dragging can break the legs or damage the frame integrity. Use two or more people to move this item to avoid injury.
Pilling can occur occasionally as a result of normal daily wear and should not be considered a fault. Please check the care labels on your sofa bed to see if a battery-operated pilling tool is suitable for the removal of fiber pills.
Delivery
With our Free Standard Shipping, your order is delivered right to your room of choice. Our specialized freight carrier will call you early in its journey to schedule a delivery window that works for you.
Delivery Timeline: 7–21 days from your dispatch date.
Want a completely hands-off experience? Upgrade to our White Glove service at checkout!
Box 1
Dimensions: W39" x D12.6" x H28.7"
Boxed weight: 39.7lbBox 2
Dimensions: W39" x D12.6" x H28.7"
Boxed weight: 39.7lbBox 3
Dimensions: W39" x D16.1" x H28.7"
Boxed weight: 41.9lbBox 4
Dimensions: W39" x D16.1" x H28.7"
Boxed weight: 41.9lbBox 5
Dimensions: W39" x D16.1" x H28.7"
Boxed weight: 41.9lbBox 6
Dimensions: W39" x D31.5" x H13.8"
Boxed weight: 57.3lbBox 7
Dimensions: W39" x D31.5" x H13.8"
Boxed weight: 57.3lbBox 8
Dimensions: W39" x D31.5" x H13.8"
Boxed weight: 57.3lbBox 9
Dimensions: W42.5" x D32.7" x H13.8"
Boxed weight: 55.1lbBox 10
Dimensions: W48.8" x D20.1" x H28.7"
Boxed weight: 52.9lbBox 11
Dimensions: W42.5" x D32.7" x H13.8"
Boxed weight: 55.1lbBox 12
Dimensions: W48.8" x D20.1" x H28.7"
Boxed weight: 52.9lb120-Day Free Returns
We include a FREE 120-day trial when you buy any Koala product from our website (including sale items.)
Need to return your purchase? No worries, we’ll come pick it up FREE of charge and provide you with a full refund.Assembly Instructions
Reviews
4.9 (23)
-
Product specifications
Product Description
The Tamarama is an elevated icon, designed for timeless, all-day comfort. With modular flexibility, ultra-soft HyperCloud™ Foam, and washable covers, it’s style that stays with you.
Dimensions
Footprint width: 148"
Footprint depth: 110"
Height: 37"
Seat height: 20.5"
Seat depth (with back cushion): 25"
Seat depth (without back cushion): 33"
Weight: 455.3lb
Materials, sustainability & care
Forest Walk, Bronzed Aussie, Winter Cream fabrics: Face: 100% Recycled Polyester, Backing: 100% Polyester
Aussie Latte, Frosty Grass, Pebble Beach fabrics: Face: 70% Polyester, 20% Recycled Polyester, 10% Acrylic, Backing: 100% Polyester
Frame: FSC® Certified Wood
Foam: Polyurethane Foam
Fill (Armrest Cushions/ Backrest Cushions / Seat inserts): Polyester Fibre & Polyurethane Foam
Legs: Polypropylene
SustainabilityAll timber materials in this product come from FSC® -certified forests.
By choosing this FSC®-certified and labelled product, you show your commitment to forests and those that depend on them.
FSC® N003088
www.fsc.orgCountry of Origin: Designed by Koala in Sydney, assembled in China.
Care
Fixed Frame, Arm & Lining Cushion Covers:
- Do not remove lining covers for separate cleaning even though they have zippers.
- Spot clean only with warm water & mild detergent mix.
- Do not scrub with a stiff brush.
- Use a clean cloth to blot out excess liquid.
- Do not wet filling.
- Allow to thoroughly dry before re-use.
- Do not bleach.
- Do not iron.
- Do not dry clean.
- Ensure removable covers are completely dry before fitting covers back on.
Removable Cover Care
- Vacuum on low suction to remove dust and grit.
- Give your cushions some love by regularly rotating them, changing their positions and plumping them up. This keeps them looking full and prevents "favourite spot" wear and tear.
- Smooth & straighten covers: Take a moment to align hems, smooth out wrinkles, and adjust covers to keep the silhouette sharp.
- Position your sofa away from direct sunlight to prevent fabric fading over time.
For spills & accidents:
- Act Fast: Blot spills immediately with a clean, dry cloth or paper towel.
- No Scrubbing: Avoid using stiff brushes or harsh chemicals, as these can damage the fabric fibres.WARNING:
- Keep furniture a safe distance away from open flames and strong sources of heat (e.g., heaters, fireplaces, radiators, wall or floor vents). If left too close this may create a fire hazard or damage furniture, including internal frames and other components.
- Do not modify or change any components within this product without specific advice from Koala. This will void your warranty and may cause instability, damage or collapsing of the frame, resulting in injury.
- Careless use of cigarettes and matches could set fire to this product.
CAUTION:
- Do not stand or jump on seat cushions, backrests, or arms. This may cause instability, damage or collapsing of the frame, resulting in injury. This unit is designed for seating or sleeping use only.
- Do not drag this furniture. Always lift the furniture from the base when moving. Dragging can break the legs or damage the frame integrity. Use two or more people to move this item to avoid injury.
Pilling can occur occasionally as a result of normal daily wear and should not be considered a fault. Please check the care labels on your sofa bed to see if a battery-operated pilling tool is suitable for the removal of fiber pills.
Delivery
With our Free Standard Shipping, your order is delivered right to your room of choice. Our specialized freight carrier will call you early in its journey to schedule a delivery window that works for you.
Delivery Timeline: 7–21 days from your dispatch date.
Want a completely hands-off experience? Upgrade to our White Glove service at checkout!
Box 1
Dimensions: W39" x D12.6" x H28.7"
Boxed weight: 39.7lbBox 2
Dimensions: W39" x D12.6" x H28.7"
Boxed weight: 39.7lbBox 3
Dimensions: W39" x D16.1" x H28.7"
Boxed weight: 41.9lbBox 4
Dimensions: W39" x D16.1" x H28.7"
Boxed weight: 41.9lbBox 5
Dimensions: W39" x D16.1" x H28.7"
Boxed weight: 41.9lbBox 6
Dimensions: W39" x D31.5" x H13.8"
Boxed weight: 57.3lbBox 7
Dimensions: W39" x D31.5" x H13.8"
Boxed weight: 57.3lbBox 8
Dimensions: W39" x D31.5" x H13.8"
Boxed weight: 57.3lbBox 9
Dimensions: W42.5" x D32.7" x H13.8"
Boxed weight: 55.1lbBox 10
Dimensions: W48.8" x D20.1" x H28.7"
Boxed weight: 52.9lbBox 11
Dimensions: W42.5" x D32.7" x H13.8"
Boxed weight: 55.1lbBox 12
Dimensions: W48.8" x D20.1" x H28.7"
Boxed weight: 52.9lb120-Day Free Returns
We include a FREE 120-day trial when you buy any Koala product from our website (including sale items.)
Need to return your purchase? No worries, we’ll come pick it up FREE of charge and provide you with a full refund.Assembly Instructions
Reviews
4.9 (23)
Use left and right arrow keys to navigate between product images
-
Save $1,575On saleDimensionsSpecsZoom -
-
-
-
-
-
-
-
-
Winter Cream
Forest Walk
Bronzed Aussie
Pebble Beach
Frosty Grass
Aussie Latte
The ideal off-white, featuring a balanced neutral undertone. A subtle high-low texture, achieved through mixed yarns, gives it a natural coastal effect.
-
Koala exclusive
-
Machine washable
-
Water-resistant
-
Spot-cleans easily
Fabric type
Plain WeaveMade from
100% Recycled PolyesterA rich, deep olive green. With its neutral, earthy tones, this colour evokes the mystery and tranquility of nature’s hidden corners.
-
Koala exclusive
-
Water-resistant
-
Machine washable
-
Spot-cleans easily
Fabric type
Plain WeaveMade from
100% Recycled PolyesterRich earthy brown with a smooth weave. Evoking sun-tanned beach bods and outback sand.
-
Koala exclusive
-
Water-resistant
-
Machine washable
-
Spot-cleans easily
Fabric type
Plain WeaveMade from
100% Recycled PolyesterDrawn from the stunning landscapes of Western Australia, Byron & Darwin. Pink earth, warm sunsets with a dusty-softness describe this level of blush-pink.
-
Water-resistant
-
Machine washable
-
Spot-cleans easily
Fabric type
Woven BoucleMade from
Face: 70% Polyester, 20% Recycled Polyester, 10% Acrylic Backing: 100% PolyesterInspired by our sun kissed national parks. Soft & gentle sagey green that is sun-kissed and lived-in.
-
Water-resistant
-
Machine washable
-
Spot-cleans easily
Fabric type
Woven BoucleMade from
Face: 70% Polyester, 20% Recycled Polyester, 10% Acrylic Backing: 100% PolyesterA perfect blend of beige, off-white and grey. It’s combination of light loops & grey speckle create a natural coastal effect.
-
Machine washable
-
Water-resistant
-
Spot-cleans easily
Fabric type
Woven BoucleMade from
Face: 70% Polyester, 20% Recycled Polyester, 10% Acrylic Backing: 100% PolyesterCouldn't load pickup availability
-
Free, fast delivery
-
120-day returns
-
5-year warranty
Product Description
Product Description
The Tamarama is an elevated icon, designed for timeless, all-day comfort. With modular flexibility, ultra-soft HyperCloud™ Foam, and washable covers, it’s style that stays with you.
Dimensions
Dimensions
Footprint width: 148"
Footprint depth: 110"
Height: 37"
Seat height: 20.5"
Seat depth (with back cushion): 25"
Seat depth (without back cushion): 33"
Weight: 455.3lb
Materials, sustainability & care
Materials, sustainability & care
Forest Walk, Bronzed Aussie, Winter Cream fabrics: Face: 100% Recycled Polyester, Backing: 100% Polyester
Aussie Latte, Frosty Grass, Pebble Beach fabrics: Face: 70% Polyester, 20% Recycled Polyester, 10% Acrylic, Backing: 100% Polyester
Frame: FSC® Certified Wood
Foam: Polyurethane Foam
Fill (Armrest Cushions/ Backrest Cushions / Seat inserts): Polyester Fibre & Polyurethane Foam
Legs: Polypropylene
Sustainability
All timber materials in this product come from FSC® -certified forests.
By choosing this FSC®-certified and labelled product, you show your commitment to forests and those that depend on them.
FSC® N003088
www.fsc.org
Country of Origin: Designed by Koala in Sydney, assembled in China.
Care
Fixed Frame, Arm & Lining Cushion Covers:
- Do not remove lining covers for separate cleaning even though they have zippers.
- Spot clean only with warm water & mild detergent mix.
- Do not scrub with a stiff brush.
- Use a clean cloth to blot out excess liquid.
- Do not wet filling.
- Allow to thoroughly dry before re-use.
- Do not bleach.
- Do not iron.
- Do not dry clean.
- Ensure removable covers are completely dry before fitting covers back on.
Removable Cover Care
- Vacuum on low suction to remove dust and grit.
- Give your cushions some love by regularly rotating them, changing their positions and plumping them up. This keeps them looking full and prevents "favourite spot" wear and tear.
- Smooth & straighten covers: Take a moment to align hems, smooth out wrinkles, and adjust covers to keep the silhouette sharp.
- Position your sofa away from direct sunlight to prevent fabric fading over time.
For spills & accidents:
- Act Fast: Blot spills immediately with a clean, dry cloth or paper towel.
- No Scrubbing: Avoid using stiff brushes or harsh chemicals, as these can damage the fabric fibres.
WARNING:
- Keep furniture a safe distance away from open flames and strong sources of heat (e.g., heaters, fireplaces, radiators, wall or floor vents). If left too close this may create a fire hazard or damage furniture, including internal frames and other components.
- Do not modify or change any components within this product without specific advice from Koala. This will void your warranty and may cause instability, damage or collapsing of the frame, resulting in injury.
- Careless use of cigarettes and matches could set fire to this product.
CAUTION:
- Do not stand or jump on seat cushions, backrests, or arms. This may cause instability, damage or collapsing of the frame, resulting in injury. This unit is designed for seating or sleeping use only.
- Do not drag this furniture. Always lift the furniture from the base when moving. Dragging can break the legs or damage the frame integrity. Use two or more people to move this item to avoid injury.
Pilling can occur occasionally as a result of normal daily wear and should not be considered a fault. Please check the care labels on your sofa bed to see if a battery-operated pilling tool is suitable for the removal of fiber pills.
Delivery
Delivery
With our Free Standard Shipping, your order is delivered right to your room of choice. Our specialized freight carrier will call you early in its journey to schedule a delivery window that works for you.
Delivery Timeline: 7–21 days from your dispatch date.
Want a completely hands-off experience? Upgrade to our White Glove service at checkout!
Box 1
Dimensions: W39" x D12.6" x H28.7"
Boxed weight: 39.7lb
Box 2
Dimensions: W39" x D12.6" x H28.7"
Boxed weight: 39.7lb
Box 3
Dimensions: W39" x D16.1" x H28.7"
Boxed weight: 41.9lb
Box 4
Dimensions: W39" x D16.1" x H28.7"
Boxed weight: 41.9lb
Box 5
Dimensions: W39" x D16.1" x H28.7"
Boxed weight: 41.9lb
Box 6
Dimensions: W39" x D31.5" x H13.8"
Boxed weight: 57.3lb
Box 7
Dimensions: W39" x D31.5" x H13.8"
Boxed weight: 57.3lb
Box 8
Dimensions: W39" x D31.5" x H13.8"
Boxed weight: 57.3lb
Box 9
Dimensions: W42.5" x D32.7" x H13.8"
Boxed weight: 55.1lb
Box 10
Dimensions: W48.8" x D20.1" x H28.7"
Boxed weight: 52.9lb
Box 11
Dimensions: W42.5" x D32.7" x H13.8"
Boxed weight: 55.1lb
Box 12
Dimensions: W48.8" x D20.1" x H28.7"
Boxed weight: 52.9lb
120-Day Free Returns
120-Day Free Returns
We include a FREE 120-day trial when you buy any Koala product from our website (including sale items.)
Need to return your purchase? No worries, we’ll come pick it up FREE of charge and provide you with a full refund.
Assembly Instructions
Assembly Instructions
Reviews
4.9 (23)
Reviews
4.9 (23)Complete the set
-
Regular priceRegular price
Sale price

Product Features
Six reasons it’s worth it
-
Made to handle the mess.
-
Rearrange it, or add a module later.
-
Soft on top, supported underneath.
-
A new look, not a new sofa.
-
More care in what it's made from.
-
120 day trial
Take a closer look
Our softest sofa yet.
The cloud sofa, done right.
Deep, pillowy and relaxed, and comfortable in just about any room. This is the softest sofa Koala has made.
Sink-in meets support.
Tamarama is soft the moment you sit down, and provides proper support for longer lounging. Plush deep-fill cushions and cloud-soft HyperCloud™ foam make every seat the best one in the house.
Quality in every layer.
Solid FSC® certified wood frame. S-spring suspension that won't sag. Built from the inside out to stay supportive, and look sharp, for years.
No fluffing required.
Our cushions hold their shape through daily use, so Tamarama keeps looking its best without having to plump it after every sit.
Tool-free assembly in minutes.
Sofa, chaise, corner and curved modules connect with ease and come apart the same way. With tool-free assembly and endless modularity you can reconfigure, expand, or reposition your layout whenever you like.
Softness, engineered
Cloud feel, no feathers
Cloud feel, no feathers
Deep-fill back cushions give Tamarama its soft, sink-in feel, using a feather alternative rather than down. They hold their shape through daily use, without the constant fluffing feather cushions need.
Built to hold its shape
Built to hold its shape
A timber frame with heavy-duty tensioned S-spring suspension spreads weight evenly across every seat, so the sofa stays supportive for years rather than sagging in the middle.
HyperCloud™ foam
HyperCloud™ foam
Koala's own ultra-soft foam sits in the top layer of every seat. It's soft the moment you sit down, then firms up underneath to keep you feeling supported.
How it sits
People also browse
Customer Reviews
- SCSkye C.ReviewingTamarama Sectional SofaI recommend this productRated 5 out of 5 starsBest couch I have ever owned
Absolutely phenomenal!! 🤩
It arrived in record time, was so easy to set up, and is now officially the most comfortable piece of furniture in the house! I might have to update the mattresses next! 😂
The washable covers were what really sold me on the couch, but now I’m even more excited to come home after a big day and relax on it. It’s honestly become my favourite spot in the house! ❤️
Was this helpful? - HDHolly d. c.ReviewingTamarama Sectional SofaI recommend this productRated 5 out of 5 starsSofa that ticks all my boxes
I looked for ages for a sofa that fit all of our requirements. My biggest bug bears with other sofas I looked at was the crappy fabric options (do not get a cheap white boucle for the love of god!) and the lack of back support. I
Opted for this sofa for the deluxe fabric options and the fact that it was not only cushioned in a way that not many other sofas are, but also that old and young find this sofa supportive to the back and neck and like a big hug for your whole body.
It’s worth the little bit more money for these things as I’m confident this will see us through many years.
My only thing worth noting is that things can fall between the modular sections and are a bit hard to retrieve which does happen with young kids but I love the locking system that Koala have developed. It’s super easy to pull apart if you need to.
Was this helpful? - JLJosh L.ReviewingTamarama Sectional SofaI recommend this productRated 5 out of 5 starsThe ultimate family couch
After making do with an ikea couch for the past 5+ years we took the plunge on the Tama.. it’s another level of comfort, aesthetics and design. Plus the customer care team are incredible and responsive. We have kids and a dog, this is super durable and cleans easily A++
Was this helpful? - EJEric J.Verified BuyerReviewingTamarama Sectional Sofa ComponentI recommend this productRated 5 out of 5 starsThe PERFECT couch!
By far the most well-designed, comfortable, and stylish couch we've ever owned. It is so incredibly simple to change the configuration, that we can have a huge, fluffy couch, a small couch and matching chairs, or a cozy guest bed, all in the same day. The fabric is soft and durable, and washes up beautifully when life happens. We are blown away by the quality, and the thought that went into every detail. We highly recommend this couch. We couldn't be happier with our purchase!
Was this helpful? - KCKerry C.ReviewingTamarama Sectional SofaI recommend this productRated 5 out of 5 starsThe most comfortable couch in the world
This couch is amazing. The comfort is by far the best of all the couches I’ve had in my lifetime. Especially love that it’s possible to purchase anew covers. Saying that, the covers are washable, but it’s nice to have the option.
Was this helpful?
FAQs about the Tamarama Sectional Sofa
How many configurations can I create with the Tamarama modular sofa?
The Tamarama Modular Sofa is design for maximum flexibility. From a 1-seater armchair all the way to a 10-seat sofa with corners and chaise configurations, our specially designed Quick-Lock™ connectors make rearranging and adding Tamarama sections easy as.
Can I add more modules later to upscale my sofa from for example a 2-seater to a 4-seater?
Absolutely! Our modular design allows you to easily expand your Tamarama Modular Sofa by ordering additional sections. Whether you want to add a chaise for stretching out or a corner section to create a larger L-shape, you can easily modify and expand your seating arrangement to fit your changing needs.
How many throw cushions come with sofa?
Every Tamarama Modular Sofa comes with two throw cushions (one for each arm). If you choose a corner configuration, you'll receive an additional cushion for each corner piece.
Can I switch the chaise or corner from the left side to the right side?
Yes, absolutely. Because the Tamarama is fully modular, you can easily switch the chaise or corner section from the left side to the right side at any time to accommodate your space.
How do I maintain the Tamarama modular sofa cushions?
The Tamarama modular sofa features super plush, sink-in cushions designed for maximum comfort. To keep them looking their best, regularly rotate and fluff the cushions to prevent the fibers from gathering in one spot.
Can I remove the covers for the Tamarama modular sofa?
Yes! We know life happens, so we designed the Tamarama Modular Sofa with fully removable and washable covers to make keeping your sofa fresh a breeze.
Are the sofa covers supposed to be wrinkled?
Yes! The covers are designed with a relaxed, lived-in aesthetic. They naturally feature a beautiful, slight wrinkle, very similar to the texture of fresh linen.
Cozy home, and a healthy planet
-
Help us save the koala from extinction
Your order helps WWF protect koalas and work toward doubling their numbers by 2050. Over $5.5M donated so far.
-
Proud members of 1% For The Planet
At least 1% of the sales from every order helps environmental causes, and you've helped us donate over $21 million (AUD) to date.
-
We’re a Certified B Corporation
We meet the highest standards for social and environmental impact so you can feel good choosing us.