Tamarama Sectional Sofa

Tamarama Sectional Sofa Tamarama Sectional Sofa
4.9
Rated 4.9 out of 5 stars
4.9 Stars (23 Reviews)
Tamarama Sectional Sofa Tamarama Sectional Sofa
Save $1,350
On sale
Regular price $4,050
Regular price $5,400 Sale price $4,050
Save $1,350
Shape: Curved
Configuration: Corner
Color: Forest Walk
Classic Fabric
Premium Fabric

Size: 5 Sections

W133" x D102" x H37"


Section Width: Regular

View full product details
  • Truck Icon Free, fast delivery
  • Calendar icon 120-day returns
  • Shield icon 5-year warranty

Product Description

The Tamarama is an elevated icon, designed for timeless, all-day comfort. With modular flexibility, ultra-soft HyperCloud™ Foam, and washable covers, it’s style that stays with you.

Dimensions

Footprint width: 133"

Footprint depth: 102"

Height: 37"

Seat height: 20.5"

Seat depth (with back cushion): 25"

Seat depth (without back cushion): 33"

Weight: 418.9lb

Materials, sustainability & care

Forest Walk, Bronzed Aussie, Winter Cream fabrics: Face: 100% Recycled Polyester, Backing: 100% Polyester

Aussie Latte, Frosty Grass, Pebble Beach fabrics: Face: 70% Polyester, 20% Recycled Polyester, 10% Acrylic, Backing: 100% Polyester

Frame: FSC® Certified Wood

Foam: Polyurethane Foam

Fill (Armrest Cushions/ Backrest Cushions / Seat inserts): Polyester Fibre & Polyurethane Foam

Legs: Polypropylene

Sustainability

All timber materials in this product come from FSC® -certified forests.

By choosing this FSC®-certified and labelled product, you show your commitment to forests and those that depend on them.

FSC® N003088
www.fsc.org

Country of Origin: Designed by Koala in Sydney, assembled in China.

Care

Fixed Frame, Arm & Lining Cushion Covers:

  • Do not remove lining covers for separate cleaning even though they have zippers.
  • Spot clean only with warm water & mild detergent mix.
  • Do not scrub with a stiff brush.
  • Use a clean cloth to blot out excess liquid.
  • Do not wet filling.
  • Allow to thoroughly dry before re-use.
  • Do not bleach.
  • Do not iron.
  • Do not dry clean.
  • Ensure removable covers are completely dry before fitting covers back on.

Removable Cover Care

  • Vacuum on low suction to remove dust and grit.
  • Give your cushions some love by regularly rotating them, changing their positions and plumping them up. This keeps them looking full and prevents "favourite spot" wear and tear.
  • Smooth & straighten covers: Take a moment to align hems, smooth out wrinkles, and adjust covers to keep the silhouette sharp.
  • Position your sofa away from direct sunlight to prevent fabric fading over time.

For spills & accidents:
- Act Fast: Blot spills immediately with a clean, dry cloth or paper towel.
- No Scrubbing: Avoid using stiff brushes or harsh chemicals, as these can damage the fabric fibres.

WARNING:

  • Keep furniture a safe distance away from open flames and strong sources of heat (e.g., heaters, fireplaces, radiators, wall or floor vents). If left too close this may create a fire hazard or damage furniture, including internal frames and other components.
  • Do not modify or change any components within this product without specific advice from Koala. This will void your warranty and may cause instability, damage or collapsing of the frame, resulting in injury.
  • Careless use of cigarettes and matches could set fire to this product.

CAUTION:

  • Do not stand or jump on seat cushions, backrests, or arms. This may cause instability, damage or collapsing of the frame, resulting in injury. This unit is designed for seating or sleeping use only.
  • Do not drag this furniture. Always lift the furniture from the base when moving. Dragging can break the legs or damage the frame integrity. Use two or more people to move this item to avoid injury.

Pilling can occur occasionally as a result of normal daily wear and should not be considered a fault. Please check the care labels on your sofa bed to see if a battery-operated pilling tool is suitable for the removal of fiber pills.

Delivery

With our Free Standard Shipping, your order is delivered right to your room of choice. Our specialized freight carrier will call you early in its journey to schedule a delivery window that works for you.

Delivery Timeline: 7–21 days from your dispatch date.

Want a completely hands-off experience? Upgrade to our White Glove service at checkout!

Box 1
Dimensions: W39" x D12.6" x H28.7"
Boxed weight: 39.7lb

Box 2
Dimensions: W39" x D12.6" x H28.7"
Boxed weight: 39.7lb

Box 3
Dimensions: W31.1" x D15.7" x H28.7"
Boxed weight: 35.3lb

Box 4
Dimensions: W31.1" x D15.7" x H28.7"
Boxed weight: 35.3lb

Box 5
Dimensions: W31.1" x D15.7" x H28.7"
Boxed weight: 35.3lb

Box 6
Dimensions: W31.5" x D31.5" x H13.8"
Boxed weight: 50.7lb

Box 7
Dimensions: W31.5" x D31.5" x H13.8"
Boxed weight: 50.7lb

Box 8
Dimensions: W31.5" x D31.5" x H13.8"
Boxed weight: 50.7lb

Box 9
Dimensions: W48.8" x D20.1" x H28.7"
Boxed weight: 52.9lb

Box 10
Dimensions: W42.5" x D32.7" x H13.8"
Boxed weight: 55.1lb

Box 11
Dimensions: W48.8" x D20.1" x H28.7"
Boxed weight: 52.9lb

Box 12
Dimensions: W42.5" x D32.7" x H13.8"
Boxed weight: 55.1lb

120-Day Free Returns

We include a FREE 120-day trial when you buy any Koala product from our website (including sale items.)

Need to return your purchase? No worries, we’ll come pick it up FREE of charge and provide you with a full refund.

Reviews

4.9 (23)

    Complete the set

    Product Features

    Six reasons it’s worth it

    • Glass bottle with pink liquid on a textured surface next to a book titled 'The Curated Closet Workbook'.

      Made to handle the mess.

    • Woman sitting on a green sofa in a bright room with large windows.

      Rearrange it, or add a module later.

    • Woman lying on a beige sofa in a modern living room.

      Soft on top, supported underneath.

    • Person holding a large white pillow on a couch

      A new look, not a new sofa.

    • Person lying on a green sofa in a living room with books and a window in the background

      More care in what it's made from.

    • Woman in an orange top and brown pants lying on a white couch.

      120 day trial

    Take a closer look

    Our softest sofa yet.

    Living room with a white sofa and large windows overlooking water.
    The cloud sofa, done right. – Chaise
    The cloud sofa, done right. – Corner
    The cloud sofa, done right. – U Shape

    The cloud sofa, done right.

    Deep, pillowy and relaxed, and comfortable in just about any room. This is the softest sofa Koala has made.

    Sink-in meets support.

    Tamarama is soft the moment you sit down, and provides proper support for longer lounging. Plush deep-fill cushions and cloud-soft HyperCloud™ foam make every seat the best one in the house.

    Quality in every layer.

    Quality in every layer.

    Solid FSC® certified wood frame. S-spring suspension that won't sag. Built from the inside out to stay supportive, and look sharp, for years.

    No fluffing required.

    Our cushions hold their shape through daily use, so Tamarama keeps looking its best without having to plump it after every sit.

    Tool-free assembly in minutes.

    Sofa, chaise, corner and curved modules connect with ease and come apart the same way. With tool-free assembly and endless modularity you can reconfigure, expand, or reposition your layout whenever you like.

    Softness, engineered

    Cloud feel, no feathers

    Deep-fill back cushions give Tamarama its soft, sink-in feel, using a feather alternative rather than down. They hold their shape through daily use, without the constant fluffing feather cushions need.

    Built to hold its shape

    A timber frame with heavy-duty tensioned S-spring suspension spreads weight evenly across every seat, so the sofa stays supportive for years rather than sagging in the middle.

    HyperCloud™ foam

    Koala's own ultra-soft foam sits in the top layer of every seat. It's soft the moment you sit down, then firms up underneath to keep you feeling supported.

    How it sits

    Customer Reviews

    4.9
    Rated 4.9 out of 5 stars
    Based on 23 reviews
    100%would recommend these products
    Slide 1 selected
    23 reviews
    • SC
      Skye C.
      Reviewing
      Tamarama Sectional Sofa
      I recommend this product
      Rated 5 out of 5 stars
      Best couch I have ever owned

      Absolutely phenomenal!! 🤩

      It arrived in record time, was so easy to set up, and is now officially the most comfortable piece of furniture in the house! I might have to update the mattresses next! 😂

      The washable covers were what really sold me on the couch, but now I’m even more excited to come home after a big day and relax on it. It’s honestly become my favourite spot in the house! ❤️

    • HD
      Holly d. c.
      Reviewing
      Tamarama Sectional Sofa
      I recommend this product
      Rated 5 out of 5 stars
      Sofa that ticks all my boxes

      I looked for ages for a sofa that fit all of our requirements. My biggest bug bears with other sofas I looked at was the crappy fabric options (do not get a cheap white boucle for the love of god!) and the lack of back support. I

      Opted for this sofa for the deluxe fabric options and the fact that it was not only cushioned in a way that not many other sofas are, but also that old and young find this sofa supportive to the back and neck and like a big hug for your whole body.

      It’s worth the little bit more money for these things as I’m confident this will see us through many years.

      My only thing worth noting is that things can fall between the modular sections and are a bit hard to retrieve which does happen with young kids but I love the locking system that Koala have developed. It’s super easy to pull apart if you need to.

    • JL
      Josh L.
      Reviewing
      Tamarama Sectional Sofa
      I recommend this product
      Rated 5 out of 5 stars
      The ultimate family couch

      After making do with an ikea couch for the past 5+ years we took the plunge on the Tama.. it’s another level of comfort, aesthetics and design. Plus the customer care team are incredible and responsive. We have kids and a dog, this is super durable and cleans easily A++

    • EJ
      Eric J.
      Verified Buyer
      Reviewing
      Tamarama Sectional Sofa Component
      I recommend this product
      Rated 5 out of 5 stars
      The PERFECT couch!

      By far the most well-designed, comfortable, and stylish couch we've ever owned. It is so incredibly simple to change the configuration, that we can have a huge, fluffy couch, a small couch and matching chairs, or a cozy guest bed, all in the same day. The fabric is soft and durable, and washes up beautifully when life happens. We are blown away by the quality, and the thought that went into every detail. We highly recommend this couch. We couldn't be happier with our purchase!

    • KC
      Kerry C.
      Reviewing
      Tamarama Sectional Sofa
      I recommend this product
      Rated 5 out of 5 stars
      The most comfortable couch in the world

      This couch is amazing. The comfort is by far the best of all the couches I’ve had in my lifetime. Especially love that it’s possible to purchase anew covers. Saying that, the covers are washable, but it’s nice to have the option.

    FAQs about the Tamarama Sectional Sofa

    How many configurations can I create with the Tamarama modular sofa?

    Can I add more modules later to upscale my sofa from for example a 2-seater to a 4-seater?

    How many throw cushions come with sofa?

    Can I switch the chaise or corner from the left side to the right side?

    How do I maintain the Tamarama modular sofa cushions?

    Can I remove the covers for the Tamarama modular sofa?

    Are the sofa covers supposed to be wrinkled?

    Cozy home, and a healthy planet

    • koala sleeping in tree

      Help us save the 
koala from extinction

      Your order helps WWF protect koalas and work toward doubling their numbers by 2050. Over $5.5M donated so far.

    • sunny landscape

      Proud members
of 1% For The Planet

      At least 1% of the sales from every order helps environmental causes, and you've helped us donate over $21 million (AUD) to date.

    • greenery plant in forest with certified b corporation logo

      We’re a Certified 
B Corporation

      We meet the highest standards for social and environmental impact so you can feel good choosing us.

    Sign up and get up to $1500+ off

    Tamarama Sectional Sofa Forest Walk

    Forest Walk
    Regular price $4,050
    Regular price $5,400 Sale price $4,050